Large diameter double-wall corrugated pipe is processed through the proverbial PVC and PE through the forming machine, which can be directly formed into the double-wall corrugated pipe and can make different specifications of large diameter double-wall corrugated pipe products by replacing the modules respectively. And PE pipe production line is a piece of important equipment for the production of such PE pipes, which needs a standardized operation in the process of use to make higher quality products and extend the service life of the equipment. So, what checks should be done before starting the PE pipe production line?
Here is the list
What checks should be done before starting the PE pipe production line?
The main technical parameters of PE pipe production line
Before using the PE pipe production line, you need to check the function of the equipment to avoid equipment failure affecting the project process during the production process. The following are the checks that need to be done before starting the PE pipe production line.
The pipe production line must be supplied with the required cooling water, compressed air, and electricity before starting up.
Turn on the main power switch of the production line and check whether the power supply of the extruder, automatic feeding system, vacuum pump and pump traction machine of the production line is normal.
Install the components such as mouth die, core die, sizing sleeve, sealing disc, gasket, and cutting machine according to the pipe specifications produced.
Adjust the vacuum sizing box and spraying box up and down position.
Add water to the vacuum box cooling box to the specified position, and adjust each water temperature control instrument to the best temperature.
The vacuum sizing machine should close each bypass pipeline, each main pipeline to water, close each manual drain valve, check whether the switch of each water supply and drainage can reach the normal position.
Turn on the main machine, set the process temperature, and turn on the temperature control. The host machine will be heated up and the temperature can be adjusted appropriately according to the production products.
When the temperature reaches the set temperature, keep it for more than 30 minutes before turning on the machine.
When the die head is mounted on the extruder, tighten the nut with a force measuring wrench according to the specified torque, and when the equipment is heated to the processing temperature, tighten the nut again, and add high-strength washers to the nut when it is mounted.
Adjust the gap between the mouth die and the core die consistently, and adjust the mouth die and the sizing water sleeve so that the two are on the same axis.
Add the corresponding raw materials into the hopper according to the production needs.
Our PE double-wall corrugated pipe production line has two models, BW-IV and BW-IV-A. Both models use the same mold material, perimeter, and cooling form, the material is special aluminum alloy, the mold perimeter is 7m, and the cooling form is air-cooled. The production speed is the same, 0.5m-2m per minute, and the raw material can be PVC and HDPE. the difference is that the main machine of BW-IV is a single/twin screw extruder with 11kw power, while the main machine of BW-IV-A is a conical single/twin screw extruder with 15kw power.
With years of production experience and advanced technology, we can provide high-quality and high-performance pipe production lines. And we have a professional team that can provide professional pre-sales consulting service and after-sales maintenance service. If you are interested in our products and want to get more detailed information, welcome to contact us, we are looking forward to your visit!
In modern plastic recycling and waste reduction systems, shredding is the first and most critical stage of material size reduction. Whether you are processing plastic lumps, pipes, films, woven bags, pallets, or industrial scrap, choosing the correct shredder type directly affects downstream crushin
A Complete Guide to Automatic and Semi-Automatic Pipe Socketing EquipmentIn plastic pipe production, extrusion is only part of the manufacturing process. For pipes such as PVC drainage pipes, water supply pipes, and large-diameter sewer pipes, the pipe ends must be expanded into a socket structure s
Learn what polymer sand tiles are, their raw materials, advantages, and complete production process. Chenxing Machinery provides full polymer sand tile production line solutions.
Introduction: Why Single Screw Extruders Remain the Backbone of Plastic ProcessingDespite the rapid development of twin screw and special extrusion systems, the single screw extruder remains the most widely used plastic processing machine in the global extrusion industry.From pipe extrusion and prof
Introduction: Why PVC Corrugated Roofing Sheets Are Widely UsedPVC corrugated roof tiles have become a mainstream roofing material in industrial buildings, warehouses, agricultural facilities, factories, and temporary construction projects.Compared with traditional metal sheets and fiber cement tile
Introduction: Why Twin Screw Extruders Are Essential for PVC ProcessingIn modern plastic extrusion manufacturing, twin screw extruders are widely recognized as the most reliable solution for processing difficult-to-melt materials such as PVC powder and high-filled compound formulations.Compared with
Introduction: Why Agglomerators Are Essential in Modern Plastic RecyclingIn plastic recycling plants, one of the biggest challenges is handling lightweight, thin, and low bulk density materials such as PE film, PP woven bags, raffia, agricultural film, and soft plastic scraps.A plastic agglomerator,
Introduction: Why Material Mixing Quality Determines Final Product PerformanceIn plastic extrusion, compounding, and recycling industries, material preparation directly affects product consistency, mechanical performance, and production stability.An SRL-Z series vertical-type mixing unit is an integ